student

Annonser för HLK

Annonser för HLK

EBOSS AB

Optimise cycle time in pressing/stamping machine


EBOSS AB needs to stay in the very front of the pressing and stamping industry to be competive. Finding the optimal SPM (Slag Per Minut - Hits Per Minut) for different tools and machines from a quality and buisness view is extremely important.

If Ct (Cycle time) is too low, tools might brake and if Ct is to high, there is no profitable buisness in the process. Today we process at around 57-65 SPM but need to investigate SPM up to 120.  

 

www.eboss.se

 

Contact

Contact:
Leif Sandvik

Application e-mail:
leif@eboss.se

Telephone:
+46(0)370 30 73 06

Link:
http://www.eboss.se/

Expiration date
2019-10-31

Period for which the assignment is intended
2019-10-31 - 2020-02-28


Company/Organisation
EBOSS AB

Category
Thesis/project

Branch

  • Engineering/Product development/Industrial design/Production management

Faculties

  • School of Engineering